Manufacturing

Production decisions are made before the first bulk stitch.

The new site makes the invisible manufacturing questions visible: base selection, fabric lead time, sample approval, QC, and packaging.

Factory workflow

A buyer-friendly path from idea to bulk

The goal is not to collect a form submission. It is to get the right production questions answered fast.

1

Review the tech pack

We check style complexity, measurements, fabric target, and trim requirements.

2

Route the order

China or Bangladesh is recommended based on MOQ, timeline, and execution risk.

3

Develop samples

Samples are usually ready in 7-10 days after details are confirmed.

4

Confirm materials

Fabric, lab dips, trims, labels, packaging, and size set are approved before bulk.

5

Produce and inspect

In-line inspection and AQL 2.5 final random sampling protect the shipment.

Fabric inspection and garment quality control station

China + Bangladesh bases

Speed, complexity, and volume are routed before bulk starts

The fusion version keeps buyer decision logic visible while adding the formal site's stronger factory-base presentation.

China apparel production facility used for sampling and complex custom apparel programs

China Premium Hub

Sampling, complex trims, and faster delivery windows.

Garment and Textile Foundation 10#B, Jinshang Town, Shishi City, Fujian, China

  • 500 pcs per style/color starting point
  • 7-10 day standard sampling after details are clear
  • Best for fabric development, trims, washes, and urgent programs
Bangladesh apparel production facility used for repeat volume and cost-sensitive programs

Bangladesh Volume Hub

Stable capacity for repeatable casualwear and sportswear volume.

Majestic Building 9, Lift 9, Number A2, Rupayan City, Uttara 1230, Bangladesh

  • 1000 pcs per style/color recommended starting point
  • Best for stable repeat production and cost planning
  • Useful after fit, materials, and packaging are approved

QC standard

AQL 2.5 with three checkpoints.

WSL focuses on incoming material checks, in-line production review, and final random inspection before shipment release.

01Incoming fabric and trim inspection
02In-line measurement and construction checks
03Final AQL 2.5 random inspection and packing review

Production routing

China for speed and complexity. Bangladesh for repeatable volume.

Every inquiry is routed by style complexity, fabric availability, timeline, quantity, and QC risk. Buyers see the trade-off before committing to a program.

Best forSampling, urgent orders, complex stylesStable volume and cost-sensitive repeat production
MOQ500 pcs per style/color1000 pcs per style/color
Bulk lead20-35 days when fabric is in stock90-120 days after fabric confirmation
StrengthFabric development, trims, speedStable capacity, repeat order economics

Compliance and material routes

Specific sustainability claims, not decoration.

Certification availability depends on the selected fabric, supplier route, order volume, and testing requirements. The site states what can be routed and verified instead of making broad unsupported claims.

OEKO-TEXBSCIGOTSGRSHigg Index
Fabric inspection for apparel production quality control Cotton field representing natural fiber sourcing options

Ready to quote?

Send the tech pack, style photos, or target sample.

Direct email: kelvin@wsltextile.com | WhatsApp: +86 158 8091 7666

WA